Then you will need to let it dry before you do anything else with the floor.
How to level out a floor.
Remove any baseboards as well because the height of the floor will raise after you level it.
If you suspect that you re working with an off level foundation you can get it ready for installation quickly by using a floor leveling compound.
You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
Raise the lower end of the level until the bubble is centered then measure the distance from the bottom of the level to the floor to find the depth of the dip.
Use a metal putty knife or scraper to gently pry baseboards off the walls.
The material flows out like thick syrup then hardens into a smooth perfectly level surface sometimes in less than an hour.
Installing gutters and downspouts and keeping.
Lay a long level downhill on the floor with one end of the level on the level part of the floor and the other end at the lowest point.
Self leveling compound is a cement based mixture that is applied in a near liquid state.
The easiest way is to use a self leveling compound also called liquid floor underlayment or floor resurfacer within sections of level cut rails.
Start by stabilizing the moisture content of the soil near the foundation.
With this type of substance you can apply it with a trowel and spread it evenly over the floor.
When inflexible flooring is installed over a substrate that dips or heaves various things.
Before embarking on the floor leveling project here take a simpler approach first.
On the top side of the floor another fix it idea to lay down new hardwood over the existing floor.
Thus by repairing your out of level floor you may find the windows and doors in your home are a whole lot easier to use and last longer.
A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too.
It will find the lowest areas of the floor and work to level out the subfloor.
You can then smooth it out using a hand trowel and sand the entire surface for a seamless finish.
Simply mix up the compound pour it over the subfloor and wait for it to fill in the lowest spots.
The process of fixing both an out of level and an out of plane floor is simply known as leveling a floor.
Take everything out of the room so that the floor is completely clear.