A recessed shower floor allows for the installation of a sloped mortar bed or a prefabricated shower tray that is flush with the rest of the bathroom floor.
How to level floor for kerdi pan.
If the floor is level the bubble will be in the center section.
I m using a preformed schluter kerdi shower tray.
Thin set 1 4 backer board then use self leveler over the top.
Add 1 2 plywood shimmed and screwed to joists.
Repeat this process across the entire floor roughly every 4 to 6 inches marking the uneven areas with a pencil.
This video shares part 1 of how to do a schluter shower installation we discuss what s in the kit how to add a prefab niche customize the pan cut down th.
Thin set kerdi pan to plywood.
But before i actually installed the new drain i cut the shower tray to the size i needed our size was about 54 and the tray was 60 to cut the tray i used a razor blade and square.
Thinset mortar is a type of cement used for the adherence of tiles and flooring to substrate or subfloor materials.
Installing the schluter kerdi drain adapter.
Thanks for any input.
This would save me a 1 2 between the sub floor under the shower pan and the sub floor in the rest of the room which should allow.
Any other ideas would be greatly appreciated.
Check the level s bubble.
Use something like quick pitch and mud bed for the pan and cover with kerdi.
Thin set kerdi pan to that.
Check the floor for level.
My 48x48 3 4 subfloor is out of level 5 8 from right side exterior wall.
I am planning on adding a second layer of 3 4 exterior plywood as additional sub floor support before installing the schluter pan.
Designed to accommodate the kerdi drain point drain the kerdi shower t ts tt shower tray can be installed over a recessed subfloor to create an even transition from the floor tile right.
Lay a 4 or 6 foot level on the floor from front to back.
For this shower we used the schluter kerdi drain adaptor because we already had a drain cemented into the floor.
So what i am wondering is if it is possible to inset the shower base below the level of the sub floor by removing the 3 4 existing sub floor and replacing it with 1 4 plywood topped by 1 4 fibrerock underlayment.
The level is consistent for the extire 48 run.