Laying tile begins with the layout.
How to lay outside floor tiles.
Step 1 preparing the concrete.
Ensure the surface that you are laying the porcelain tiles on is as level as possible clean and dry and remove any.
Laying tile on sand is easier than laying tiles on gravel as it s a finer type of dirt.
Allow the tile to expand and contract without cracking by placing expansion joints no more than 16 ft.
Step 4 mixing mortar.
Clean the concrete slab thoroughly before laying tile.
Porcelain tile is more durable and absorbs water less than ceramic tile.
Step 3 plan your layout in advance.
Before you begin to lay the tile over your concrete slab make sure the concrete is properly prepared.
Apply tile only to a stable well drained slab.
How to lay tile over concrete.
To avoid problems with the screed.
Mix up a.
Step 5 applying mortar.
A slab with places for puddles or ever growing cracks is no place for tile.
Use a bonded cement sand screed to level the concrete substrate if necessary.
Use a polymer modified dry set mortar adhesive that s rated for outdoor use.
Apart and anywhere the tile meets a vertical surface like steps or the house s foundation.
When laying tile you first need to ensure a solid bed this is where the tile sits and sticks to.
Consult the following resource for help with this aspect of the patio project including how to mix the adhesive and how much of it you ll need.
Even out and compact the level of the resting layer sand or gravel lay the sheet on the bed of gravel or sand maintaining a minimum gap of 1 cm or wider japanese spacing use a rubber hammer to eliminate any unevenness.
Dirt can make for a perfect bed for outdoor tiles and best of all it s very affordable.
I ve completed my first tile floor installation and i put together this video to show you all of the tips and tricks i found along the way.
Apply a waterproofing membrane such as redgard to the slab before tiling.
Select a thin bed adhesive for very flat.
Step 2 seal the concrete.
Learn how to lay.