How to prep concrete slab for hardwood flooring.
How to lay a floating timber floor on concrete.
500 750 square feet of coverage.
Also the possibility of dampness however small is greater when there are fewer membranes between your concrete foundation and your floating floor.
Always have an exit plan when laying out the floor.
For one there s less insulation.
Lay the floor parallel to longest wall in the room.
Overlap the flooring on either side but leave a 5 16 inch gap against the floating floor.
You will lay the flooring lengthwise to this wall.
Changing the floor of your home seems like an exciting idea.
You don t want be trapped in a corner and have to walk on the newly installed floors.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Use a quality cleaner like zep professional concrete and masonry floor cleaner 27 per gallon.
Laying down your floating flooring directly onto concrete is a no no.
If your subfloor is concrete cover it with a wood or engineered wood subfloor first.
Snap the chalk line over the top of the concrete or moisture barrier between the marks on opposite walls making a cross in the center of the room.
Using a glue down floor is an option in above grade installation only since installation below grade requires a plastic barrier on top of the concrete.
Drill three pilot holes along its center to keep the transition molding from splitting then fasten it to the subfloor not the flooring with 4d finish nails.
Measure and mark the center of all four walls at floor level.
Hardwood timber flooring is guaranteed durable and is low maintenance.
For the floor adhesive to properly stick the floor must be clean.
Learn how to install beautiful hardwood floors over a concrete slab.
Not only will it give the house a new look but it can also complement the home s overall interior.
Hardwood flooring is a good option for a lot of homes.
Get a comprehensive breakdown on which materials to use what to take into consideration and what steps to take for four subfloor systems.
Cut pieces as you go.
Treated plywood to the concrete with concrete screws spaced every 16 in.