Installing marble flooring can add beauty and elegance to a bathroom or foyer.
How to install marble slab floor.
The support for the marble slab shall be in the form of a projection created by a metal angle attached to the beam or floor slab or recess into the concrete floor slab.
While the types of slabs available vary greatly the principles and methods of laying slabs remain largely the same.
Slab material whether you are working with cultured stone or natural stones such as marble granite travertine and flagstone is one of the most challenging to install in any setting.
How to install marble flooring.
But in actuality marble is a very delicate flooring material that needs to be treated carefully.
Traditionally bathrooms and showers are covered with natural stone tiles or ceramic tiles of some type and while the average do it yourselfer.
Check the layout of the marble tile to avoid having a tiny edge on one end of your floor.
Dtmd tiles walltiles in this video we are going to show you how to make marble big tiles walk.
With a variety of options in coloring and finish marble tiles can complement virtually any color scheme.
A level floor is a must for installing a marble floor.
Check the slope on the floor.
You can lay slabs for paving hard surfaces on sidewalks entrances patios and more.
A slab is a structural element used for flooring similar to tiles but larger in size and usually made of concrete instead of ceramic.
Not only is it prone to cracking and chipping but it is also very porous and many materials can penetrate the surface of the stone causing permanent stains.
It is rock after all.
Reinforce the floor if needed.
How to install granite or marble slabs in a shower.
One trick is to use marble in a small area to create a striking focal point with less expensive tiles elsewhere.
Marble may seem like it is a very hard solid material.
Marble mosaics which can be made using offcuts are often more affordable.
The larger the slab the higher the price tag.
These supports must preferably be at vertical intervals not more than 3 5 m apart and over the heads of all openings.