This is your last chance to check if the ground is level and has no lumps or stray rocks so use it wisely.
How to install glued down hardwood floors.
With that said one of the most important factors while dealing with glue down installation is going to be your subfloor.
All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.
Because of the way it is installed there isn t a hollow sound when walking across the floor or a spongy feel this is something that can be an issue with floating floors if they aren t installed perfectly and with optimal conditions.
When working on a clean concrete subfloor the glue down method is often the go to choice.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
The wall coverings and painting should be completed before the installation of the hardwood flooring.
For instance solid hardwood flooring is typically nailed down during installation while tongue and groove engineered flooring is usually clicked together or completely glued down.
The floor will be glued directly to the sub flooring using a hardwood flooring adhesive.
Subfloor preparation is critical on all job sites but especially for glue down.
If installing glue down hardwood flooring in a new house completely close the building in with all outside doors and windows in place.
Installing hardwood flooring glue down method step by step instructions.
Glue down hardwood flooring often sounds more like real solid hardwood flooring than floating floors do.
Applications are more prominent with residential construction in sunbelt areas commercial locations and high rise dwellings.
The type of installation you choose will depend on your subfloor budget lifestyle and the type of wood flooring you select.
Installing engineered wood flooring is a great project for the diyer who desires the look of a professional wood floor with the strength and longevity offered by its sturdy design.
The installation of hardwood floors by the glue down method is used predominately on concrete slabs.
The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.