After installation flooring should be one of the last items installed in a project.
How to install fusion hybrid flooring.
Hybrid features trigon core technology which is a core board manufactured from limestone.
Initial routine maintenance daily or as needed.
In order to protect the floors while other trades are finishing their work prior to final cleanup and turnover to the owner use rosin paper and only use 3m scotch blue 2080 tape to.
It is best to install evp flooring over embedded floor heating systems.
Sweep dust mop or vacuum the floor to remove all loose dirt and grit.
Installing the flooring over concrete without a mold proof moister barrier was not the thing to do as you now know.
Lightly damp mop with well wrung mop.
Fuzion laminate installation instructions.
Fusion hybrid floor residential maintenance guidelines newly installed floor care always use plywood or other boards when moving heavy objects across the floor.
Hours at normal room temperatures before installation and after.
When installing fusion hybrid floors using the glue down method a multi purpose adhesive should be used and applied to the subfloor using adhesive manufacturer s recommended trowel.
Hybrid laminate is an interior product only and must be installed in a temperature controlled environment maintained between 65 and 85 degrees f.
Take a look at our tight lock hybrid floor installation video.
Fusion hybrid flooring has a rigid waterproof core and is fully waterproof which means you can install it in basements bathrooms kitchens and laundry rooms without worrying about the staining warping and other damage that can occur to other types of flooring.
Flooring may expand or contract resulting in gapping.
I have this flooring on my home both in the bathroom and sizable living room both.