The two main installation methods over concrete.
How to install bamboo click flooring on concrete.
Floating the floor using uniclic flooring.
However because of the evolution of technology it is now very easy to install bamboo click flooring like a pro.
Now it is essential that the bamboo flooring must be acclimated with the concrete before installing it.
Allow the concrete floor to cure for between 60 and 90 days if new before installing the bamboo.
Floating the floor using tongue and groove flooring not parquet block 2.
The glue down method can be used for solid or engineered bamboo flooring.
Gluing the floor down to a concrete or wood.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.
We have provided all of the steps you need to know in order to install bamboo on a concrete subfloor as well as how to maintain if afterwards.
This means looking at either the strand woven click bamboo or the 9mm bamboo.
Secret nailing the floor down to a wood subfloor.
The most important factor is to use an approved urethane wood floor adhesive with vapor sound barrier and the trowel that is used specifically for that adhesive in this method you will adhere the bamboo flooring directly to the concrete slab.
Open up the bamboo flooring and lay it on the concrete for 48 to 72 hours.
There are four different ways to install plank style bamboo flooring and only one way to install parquet block bamboo.
For both wood and concrete subfloors the radiant heat should be turned on for approximately one week to ensure excess moisture is removed.
This would be the fastest and easiest for you to install your bamboo flooring.
If installing glueless click bamboo on concrete the concrete should be fully cured 30 60 days before beginning preparation for flooring.
Click here to cancel reply.