Concrete is the most commonly used material for basement floors because it is inexpensive durable easy to work with and versatile.
How to floor concrete basement.
Step 1 place plumbing stubs.
If you are building a new house and plan to pour your first basement you will need a good set of instructions such as those below.
One of concrete s few weaknesses however is porousness which means that it allows water vapor to enter the basement through the slab floor and foundation walls.
In some older homes the basement floor consists of dirt or gravel rather than a poured concrete slab.
Smooth concrete can be easily covered with your choice of.
The first step to making the most of any basement is to achieve a level floor.
Use option a to keep your floor dry if you have damp floors.
Apply two coats of conflex flexible concrete waterproofer smooth h c colortop solvent based solid color concrete sealer or h c colortop water based solid color concrete stain according.
Concrete basement floors can be warm and inviting.
As any general contractor knows a concrete basement floor must be level and it must be poured in sections to prevent cracking.
Prepare the surface by cleaning the floor and etching the surface to permit penetration of the stain.
Finishing the floor by pouring concrete provides a solid surface for you to walk on and is a.
The easiest way is to use a self leveling compound also called liquid floor underlayment or floor resurfacer within sections of level cut rails.
Happily enough leveling uneven concrete slabs has an easy fix that won t sacrifice your headroom.
Install dimpled polyethylene to create an air space between the concrete and the finished floor sealing off dampness and giving moisture a chance to dissipate.
Plus information about radiant heat avoiding carpet and more.