Typically used for engineereed hardwood staple down installation works well with 3 8 5 8 inch flooring.
How to fit oak flooring on concrete.
It s really important when fitting your new engineered wood flooring to an existing concrete sub floor that the sub floor is in good condition and has an appropriately low moisture content.
Oak flooring installation labor basic basic labor to install oak flooring with favorable site conditions.
Floating a floating floor doesn t require any glue or nails although you may use glue between the tongue and the groove to keep the planks together.
As time has progressed the need to fit oak flooring into ever changing conditions has increased.
Ideally the moisture content should be no more than 8 and ideally less.
How to install click lock engineered hardwood flooring easy home renovation project for beginners.
Then nail the flooring planks with a standard flooring nailer see photo for details.
Blind nail wood flooring.
As far as concrete is.
Here s how to install flooring using the staple down method.
The solid oak flooring could then be simply nailed or screwed down.
One such area is laying an oak floor over a concrete sub floor.
Hardwood flooring installation is a big project but you can install solid hardwood floors yourself to save money with this step by step video.
One method to overcome this when laying a solid oak floor would be using the above method of laying out battens.
More and more people choosing oak floor to be laid at their houses want to install it over concrete subfloor.
Install underlayment on clean level subfloor.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Begin with the first row pre drilling holes.
Includes planning equipment and material acquisition area preparation and protection setup and cleanup.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
It takes 6 to 8 weeks for concrete to cure depending on climate and the concrete mixture.
This was our first time installing hardwood floors and i.
If you re moving into a brand new home or you just poured the concrete slab the concrete needs to cure before you can install hardwood flooring over it.
Next using your hammer insert a nail 1 inch from the wall and about every 4 inches along the board.