If your grade is level with the siding install a drip edge level with the mulch.
How much distance from siding to dirt.
Cedar vinyl metal wood artificial man made pressed wood like masonite makes no difference.
Wood siding clearance is recommended to be 8 inches from soil.
Install the drip edge one foot from the siding when controlling a grade and a little outside the drip line of a home when controlling splashing water.
That would vary with the installation but siding should pretty much never finish at the patio surface there should always be a gap and that will vary from 2 6 depending on the type of patio materials.
However most code inspectors in our area will allow as little as 1.
Wood siding sheathing and wall framing on the exterior of a building having a clearance of less than 6 inches 152 mm from the ground or less than 2 inches 51 mm measured vertically from concrete steps porch slabs patio slabs and similar horizontal surfaces exposed to the weather.
If the adjacent ground is concrete such as part of a patio or a sidewalk it still requires the same clearance as bare earth.
Wood siding stucco vinyl brick all siding should ideally have at least 6 to 8 inches clearance above the ground.
Wood products need to be able to dry thoroughly after rain and the extra space aids that process.
Any water that seeps between the concrete and siding will most definitely cause damage.
6.
Jprettol jon prettol february 2 2006 3 04am 12 the normal code required clearance for exterior siding or stucco at a conrete patio or tile is 2.
Minimum distance between siding and grade a concrete walkway runs around my house front to side to backyard.
The recommended clearance of masonry siding products brick stone etc is 6 inches.
The grade should be at least eight inches between the ground and the first siding row no matter what type of exterior siding we are talking about.
The dirt should never touch the siding a minimum of 2 of concrete between dirt and siding.
Leave a 1 2 gap from the top of the edging to keep mulch from touching the siding.
The concrete and the dirt bed slowly rise a few inches from the front of the house to the back of the house.
There s about 3 dirt bed with plants between the walkway and the house.
I added in my report a note that 2 minimum clearance is required between the siding and the patio surface.
Any clearance is better than none.
Wood siding stucco vinyl brick.